Padel court construction
and installation

To build a padel court you need a 23 by 13 meter site, a permit, a flat reinforced concrete slab with footings for the enclosure posts, a court kit (steel frame, tempered glass, mesh, turf, net and lights) ordered 10 to 16 weeks ahead, and an installer who has assembled that kit before. The slab takes 2 weeks plus 28 days of cure; the court assembles in 5 to 10 days on top of it. A finished outdoor court plans at $40,000 to $75,000.

Padel court builders are usually two trades: a local concrete contractor for the slab and footings, and an installer certified by the kit maker for the enclosure, glass, turf and lights. Some firms do both under one contract.

Key figures

Site per court
approx. 23 × 13 m (75 × 43 ft) including run-off and masts
Slab
15–20 cm reinforced concrete, flat to 3 mm over 3 m, 0.5–1% slope outdoors
Footings
Engineered per post; 18 posts on a standard panoramic court
Kit lead time
10–16 weeks from order to delivery
Assembly
5–10 days per court with a 3–4 person crew and a telehandler
Total timeline
12–20 weeks from permit to first game
Cost
$40,000–75,000 outdoors; $35,000–65,000 indoors plus building
Permits
Building permit for slab and structure; electrical for lights; zoning review

Free to cite with attribution and a link. Full set at courtbaseline.com/reference.

Fig. 01

How long does it take to build a padel court?

Twelve to twenty weeks from permit application to first game, and the kit lead time runs in parallel with the slab, so order the court before you pour.

Padel court build timeline over 16 weeks Gantt chart across 16 weeks. Permits and design, weeks 1 to 4. Kit order and lead time, weeks 1 to 12, running in parallel. Site preparation and footings, weeks 4 to 6. Slab pour and cure, weeks 6 to 10. Electrical rough-in, weeks 8 to 10. Court assembly, weeks 12 to 14. Turf, lights and commissioning, weeks 14 to 16. WK 0 WK 4 WK 8 WK 12 WK 16 Permits, design Kit order, lead time Site prep, footings Slab pour and cure Electrical rough-in Court assembly Turf, lights, commission
Fig. 01. A 16 week single-court build. Kit lead time, not construction, sets the schedule.

Sequence

How to build a court: the ten steps

Every padel court, from a private padel court in a backyard to a club with eight, goes through these ten steps. Skipping the engineering in step 3 is the mistake that costs the most.

How to build a padel court. Durations are for one outdoor court; multi-court projects add days to each step, not weeks.
#StepWhat happensWhoTime
1Site checkConfirm 23 × 13 m clear, access for a truck and telehandler, power within reach, soil typeOwner, builder1 week
2Zoning and permitsZoning review, building permit for slab and structure, electrical permit, HOA approval where applicableOwner, builder2–8 weeks
3EngineeringStamped slab and footing design for the chosen kit and local wind speedEngineer1–2 weeks
4Order the kitFrame, glass, mesh, turf, net, lights; 10–16 weeks lead; deposit 30–50%Owner via builderDay 1
5Site preparationStrip, grade, compact, stone base, drainage, conduit for lightsCivil contractor1–2 weeks
6Footings and slabPost footings per the stamped design, 15–20 cm reinforced slab, flatness checkedConcrete contractor1–2 weeks
7Cure28 days before the frame is anchored4 weeks
8AssemblyFrame erected and anchored, glass set, mesh fitted, masts raisedCourt installer5–10 days
9Turf and linesTurf laid, seamed, sand-dressed, lines inlaid; net and posts fittedCourt installer1–2 days
10Lights and sign-offFixtures wired, aimed and tested; inspection; warranty paperworkElectrician, installer1–2 days

What site do you need for a padel court?

A flat or gently graded area of roughly 23 by 13 meters per court, which is 75 by 43 feet, with vehicle access for a flatbed and a telehandler. Multi-court sites can share side run-off and masts, so two courts need about 23 by 24 meters rather than 23 by 26.

The 20 by 10 meter court sits in the middle. The extra 3 meters of length is for the gates and the back run-off; the extra 3 meters of width is for the masts and access. A site that is 23 by 13 to the inch leaves nowhere to stand a telehandler, so plan for a construction area larger than the finished one. Full dimensions are on padel court dimensions.

Orientation is north-south on the long axis where possible, and a line of sight to the nearest house or property line matters for the padel court noise and lighting review that follows.

Do you need a permit to build a padel court?

Yes, almost everywhere in the United States. A padel court permit is a building permit for the slab and the 4 meter structure, an electrical permit for the lights, and a zoning review for setbacks, height and impervious coverage. Padel court zoning is usually handled as an accessory structure for residential sites and as a recreation use for commercial ones.

The questions a zoning reviewer asks: how far is the enclosure from the property line (setbacks of 10 to 25 feet are typical); does the 4 meter wall exceed the accessory structure height limit (often 12 to 15 feet, which 13.1 feet usually clears); does the slab push the lot over its impervious surface limit; and do the lights spill past the line. Padel court permits take 2 to 8 weeks and sometimes require a site plan from a surveyor.

A padel court HOA review is a separate track. Most HOAs treat the court like a tennis court or a pool enclosure, with architectural review of the color, the fence height and the lighting hours. Start that conversation before the engineering, because an HOA that says no to 4 meters of glass ends the project.

Can you build a backyard padel court?

Yes, on a lot that can give up a 75 by 43 foot area, pass the setback and height rules above, and take a truck. A residential padel court costs the same $40,000 to $75,000 as a club court, because the kit and the slab are identical. A private padel court is a padel court for home use with the same engineering as a commercial one, and it is the one case where owners most often try to skip the engineer.

What a backyard build saves is the commercial permit process and the lighting requirement; what it adds is access. A padel court in garden space behind a house, with no side access for a flatbed, means glass panels carried by hand and a crane over the roof for the frame, which can add $5,000 to $15,000. The site check in step 1 is where that gets caught.

Tennis court conversion: an existing tennis slab in sound condition is the cheapest route to a backyard padel court, at $30,000 to $55,000. The slab is checked for flatness, footings are cored, and the court goes on top. See tennis court conversion.

Who builds a padel court?

Three trades: a civil or concrete contractor for the site and slab, the court manufacturer's installer or a certified independent crew for the assembly, and an electrician for the lights. A padel court builder is the company that coordinates all three and carries the warranty.

The assembly is the specialized part. A panoramic court has 18 posts, around 40 glass panels weighing 150 to 250 kg each, and a frame that must be plumb and square to the millimeter or the glass will not seat. Installers who have built the same manufacturer's court before do it in 5 days; a general contractor doing it from the manual takes 3 weeks and breaks glass. See padel court builders for how to find and vet one, and padel court kit for what the manufacturer ships.

The short version

What should I ask a padel court builder?

Ten questions. They take ten minutes and they turn three incomparable totals into three comparable ones.

  • Which Incoterm is the kit priced on? EXW leaves freight, insurance, duty and haulage with you. DDP includes them. This one question explains most of the gap between quotes that otherwise look identical.
  • Who owns the slab? Some padel court builders quote supply and erect only, assuming you deliver a finished, level, load-rated slab. Others price the groundwork. The difference is five figures.
  • How many padel courts have you completed, and where? Ask for addresses, not photographs. Photographs come from the manufacturer's library.
  • Who does the actual installation? Their own crew, a subcontractor, or a crew flown in by the manufacturer. All are workable. You want to know which, because it decides who returns for a warranty claim.
  • What is the lead time from deposit to delivery? Courts are manufactured to order, mostly abroad, and shipped by sea. A vague answer here usually means they have not placed the order with the factory yet.
  • What does the structural warranty actually cover, and who honours it? A warranty from a factory with no US entity is harder to enforce than one from the company standing in front of you.
  • What gauge is the steel and what corrosion class is the coating? Ask for the millimeter thickness and the ISO 12944 class by name. C5 is the class rated for marine and heavy industrial exposure. "Galvanized" on its own is not an answer.
  • What wind speed is the structure rated to, in mph? A number, on paper, for the model you are being quoted. Coastal and hurricane-zone counties will ask for it before they will ask you anything else.
  • Who carries the permit application, and have you checked zoning? These are two separate approvals and people conflate them. Zoning decides whether a court is allowed on that parcel at all; the building permit decides whether the structure passes. A builder should supply stamped CAD drawings and wind-load calculations for the permit, and should have raised zoning before you signed anything.
  • Are you licensed and insured in this state, and can I see the certificates? Ask for the certificate of insurance directly from the insurer, not a PDF.

Reference

What does a good specification look like?

Use this as the row you measure a quote against. These are the figures currently offered by established US padel court builders, so a quote that falls short of them should come with a reason.

Compiled August 2026 from published specifications of US padel court manufacturers and installers. Court geometry follows the International Padel Federation Rules of Padel. Figures are the current market reference, not a regulatory minimum.
ItemReference standardWhy it matters
Steel gauge3–4 mm Frame rigidity and how the glass sits over time
Corrosion coatingC5, ISO 12944 The class rated for marine and heavy industrial exposure
Structural warranty10 years Currently the longest coverage offered in the US market
Wind ratingstated in mph, per model Required by coastal and hurricane-zone jurisdictions
Glass10–12 mm tempered Structural as well as visual; thickness is a real cost line
Permit packstamped CAD plus wind-load calcs Without it your permit application stalls
Court geometry20 × 10 m, ±0.5% FIP specification; outside it, no sanctioned play

Coastal projects: most manufacturers offer a climate-rated model built for wind, salt air and extreme heat, with upgraded coatings and anchoring. Within sight of salt water that is the specification rather than an upgrade, and a builder who does not raise it has not thought about your site.

Is there a certification for court builders?

Yes, though not padel-specific. The American Sports Builders Association runs a Certified Builder program and maintains a public member directory of sports facility builders, designers and suppliers, along with published construction guidelines for courts.

ASBA certification tells you a contractor works to recognized standards on sports surfaces generally. It does not tell you they have erected a 4 meter glass and steel enclosure, because padel is newer than the certification. Treat it as a strong signal on the groundwork and a neutral one on the structure, and ask the completed-court question separately.

The FIP publishes the court specification itself in the Rules of Padel. Any builder should be able to talk fluently about the 20 by 10 meter footprint, the 0.5% tolerance and the 6 meter indoor clearance without looking them up.

What should make me walk away?

Four things, in rough order of how much they should worry you.

  • A total with no scope behind it. A single number with no breakdown of kit, slab, freight and lighting is not a quote, it is an opening position.
  • Reluctance to survey before pricing. Nobody can price groundwork from a photograph. A builder quoting a slab sight-unseen is either guessing or planning to reprice later.
  • A deposit above the industry norm with no manufacturing milestone. Deposits are normal because courts are made to order. A deposit that is not tied to a factory order date is not.
  • No answer on the warranty chain. If nobody can tell you who replaces a cracked panel in year three, assume the answer is you.

Which regions have a padel courts installation partner?

Coverage follows the market. Florida holds roughly 41% of all US padel courts, ahead of Texas at 18%, California at 10% and New York at 4.7%, so those regions were allocated first.

If your region is unallocated we will tell you plainly and, if you want, notify you when a builder takes it on. We would rather say nobody covers Nebraska yet than hand your project to a company that has never worked there.

If you build courts: one company holds each region and territories are allocated on request. Get in touch through the contact page with the states or metros you cover, the number of courts you have completed, and who insures you. See how this is funded.

Commercial and multi-court

Building more than one court?

A four-court padel club runs $160,000 to $300,000 for the courts before lights and land. Kit makers discount multi-court orders and the installation crew is mobilized once, so per-court cost drops as the court count rises.

HOAs, schools, parks and clubs also add an approval step, a board vote or a public bid, that sets the real start date. See commercial court construction for budgets by project size, approval paths and what belongs in the specification.

FAQ

Padel court construction, answered

Can I build a padel court myself?
The site work, with a contractor. The assembly, no. Padel court kits are sold with installation for a reason: the frame tolerance, the glass handling and the warranty all depend on a crew that has done it. Owners who self-assemble usually void the glass warranty.
How long does it take to build a padel court?
Twelve to twenty weeks from permit application to first game. The slab takes about 2 weeks plus 28 days of cure, the kit takes 10 to 16 weeks to arrive and runs in parallel, and assembly takes 5 to 10 days.
How much space do you need to build a padel court?
About 23 by 13 meters, or 75 by 43 feet, per court including run-off, gates and light masts. The playing surface itself is 20 by 10 meters.
Do I need an engineer to build a padel court?
Yes. The footings and slab must be designed for the specific kit and the site's wind speed and soil, and the building department will ask for the stamp. Kit manufacturers supply loads, not stamped drawings for your site.
Can a padel court be built on an existing concrete slab?
Often, if it is at least 15 cm thick, flat to 3 mm over 3 meters and uncracked. The installer cores footings for the posts through the existing slab. Old tennis courts are the most common case.
What does a padel court cost to build?
$40,000 to $75,000 for a finished outdoor court including slab, kit, installation and lighting, before land and permits. Indoors, $35,000 to $65,000 for the court plus the building. The breakdown is on the padel court cost page.
Does the padel court installation include the slab?
Sometimes, and you must ask. Some builders quote supply and erect only, assuming you provide a finished, level, load-rated slab. Others price the full groundwork. Groundwork is the largest uncontrolled cost on a new site, so a quote that excludes it is not comparable to one that includes it.
Can a general contractor build a padel court?
A competent general contractor can pour the slab and manage the site, and many projects work that way with the manufacturer's crew erecting the structure. What a first-time contractor cannot give you is judgement on panel handling, anchor tolerances and glass alignment, where mistakes are expensive and visible. Split the scope deliberately rather than by accident.
Should I buy direct from a manufacturer instead?
You can, and some manufacturers sell and install directly in the US. Buying direct means you carry freight, customs clearance, inland haulage and coordination with whoever pours the slab. That is a real project management job. It is worth doing if you have the capacity and worth avoiding if you do not.

Start the build

Ready to build a padel court?

Send the site, the court count and whether it is indoor or outdoor and we will connect you with one builder covering your region. Free, no bidding pool.

Your details go to one builder covering your region. We do not sell inquiry data and we do not add you to a marketing list.